What Is Finished Floor Elevation
N note that any below bfe finished areas includ ing foyers will violate nfip requirements may sustain unreimbursable flood damage and make the building subject to increased flood insurance premiums.
What is finished floor elevation. An important aspect of site preparation is establishing finish floor elevation for your post frame building. In many cases the elevation of the finish floor is a benchmark elevation with other dimensions noted as aff or above this finish floor height. Abbreviation used on construction plans and contract documents to indicate an elevation above the finished floor. Definition of aff above finish floor in construction.
The impact of the finished floor level is that the difference between the structural floor level and the finished floor level may require the removal of a portion of the bottom of doors. Finish floor ff determines the location of your grade board and concrete depth. Reference plane as it s name implies is the top surface of the finished flooring material. If a building not described and rated as a single family dwelling located in an a zone has an attached garage and the floor level of the garage is below the level of.
Once the finish floor elevation is established the other project elevations are based off the finish floor. What is aff above finish floor. What does ffe stand for. For example you may have masonry walls on the sides of the building showing top of wall at 16 feet 6 inches on the drawings.
What is finish floor elevation. Finished floor f f elevation is a reference plane used as a zero point for vertical dimensions. Typical usage is no component of a hanging li. N the floor of a basement where basement means the floor is below grade on all sides will always be the lowest floor regardless of how the.
The garage floor elevation is below the elevation of the top of the bottom floor. The concrete depth e g 4 or 8 will dictate how high or low your grade board will be. That wall would be 16 feet 6 inches above the finish floor. And the garage has proper openings flood vents.
A geotechnical evaluation should always be included as part of a comprehensive due diligence assessment associated with the transfer or development of any given site intended for residential or commercial structures. Ffe abbreviation stands for finished floor elevation.